February 2022: sixteen suites and one very confident purchase order
I've been specifying and ordering decorative lighting for design-build projects for nine years. In that time I've made — and documented — five significant ordering mistakes, totaling roughly $18,000 in wasted budget. This is the most expensive one. Now I keep the checklist our team uses so nobody repeats it.
The project was a boutique hotel refurb: 16 suites, a lobby, two corridors. The FF&E package landed in early February 2022. The design intent was easy to describe and hard to execute — warm, tactile, a little theatrical without being precious.
The spec came down to three things. A chic chandelier for the lobby: the Flos 2097/50 in chrome, fifty bulbs, Gino Sarfatti. Table lamps for every suite: the Flos IC T2 table lamp in brass, sixteen of them. And recessed area lights for the corridor soffits and the lobby perimeter.
That last line is where the trouble started, and I didn't know it yet.
The order (and the sale I was proud of)
Here's the thing: I thought I did this part well. I sourced the Flos fixtures through an authorized dealer. They were running a spring trade promotion — a genuine Flos lighting sale, 12% off list, freight quoted separately. I compared it against two other dealers and took it.
Then I did something dumber. I split the order. The dealer's lead time on the 2097 spares was five weeks, and an online marketplace listing had a Flos 2097 chandelier frame — the spare metal frame that carries the arms — sitting in stock, 18% under dealer cost. I bought it to have a spare. I told myself it was planning.
Freight on the dealer order read $1,600, to be confirmed. I noted it and moved on. That line item cost me more than the fixtures it delivered.
What actually went wrong
Mistake one: I dimmed a lamp that dims itself
Most buyers focus on the fixture and completely miss what happens at the outlet. I'm the buyer in this story, and I still did it.
The Flos IC T2 table lamp has a touch dimmer built into the cord. It doesn't want a wall dimmer. It doesn't need one. But I'd told the electrical contractor to put the suite table-lamp outlets on dimmed circuits, because guests should be able to dim from the wall like a hotel. Sounded great in a meeting.
Three of the sixteen units failed inside six weeks. Chopped waveform into a touch-dimmer driver does not end well. Replacement dimmer modules plus express freight from Italy: $1,900, and five weeks of complaints from three rooms.
Mistake two: the chandelier frame and the ceiling that couldn't hold it
The 2097 is a beautiful object and a structural afterthought. The chandelier frame hangs from a canopy that has to be anchored to building structure — not to a 4-inch octagon box screwed into drywall. Our lobby ceiling was drywall over furring strips. Nobody in the submittal chain flagged it.
We found out at installation. Two options: open the ceiling and add blocking, or ship a fifty-bulb chandelier back to Italy. We opened the ceiling. $2,400 in drywall, patching, paint, and a second electrician visit. Six days of schedule, gone.
The most frustrating part of chandelier work: the same issue recurs despite clear drawings. You'd think a submittal review would catch a mounting condition, but the electrical drawings and the ceiling drawings lived in different folders, and nobody put them on the same page.
Mistake three: area light meant something different to my electrician
What is an area light, anyway?
In lighting design, an area light is a luminaire that emits from an extended surface — a soft, diffuse source rather than a focused point. In hospitality interiors, that usually means the general ambient layer: recessed panels, linear soffit fixtures, big soft washes. In exterior and site work, it means something else entirely: pole-mounted parking-lot fixtures.
My spec said recessed area lights. The electrician read area lights, priced exterior poles, and roughed in at the wrong height on the wrong circuit. Nothing malicious. Two reasonable people, one vague noun.
Rework: $1,100 and three days.
Mistake four: the cheap chandelier frame wasn't cheap
The spare frame arrived from the marketplace seller in a box with no serial, no warranty card, no dealer stamp. It was an older revision — the mounting holes didn't line up with the canopy we already had. The seller's return window was fourteen days, and the return freight was on me.
Then freight damage on the first 2097 happened, and suddenly I needed a frame I could actually use. The dealer quoted a replacement at cost, five weeks out. We paid it. $1,800 down the drain on the marketplace frame, plus the lesson.
I have mixed feelings about buying lighting online. On one hand, pricing is transparent and you can comparison-shop in an afternoon. On the other, Flos warranty runs through authorized dealers, and a fixture without documentation is a fixture you own forever, problems included. I now buy decorative lighting through authorized channels and treat online marketplaces as research only.
Mistake five: freight was to be confirmed
The final invoice added liftgate delivery, inside delivery, and an accessorial charge for the site being neither clearly residential nor commercial. $1,600 that wasn't in the number I approved.
Look, I'm not saying the dealer hid anything. The line item literally said to be confirmed. I confirmed my own surprise.
Where it landed
Tally: $1,900 plus $2,400 plus $1,100 plus $1,800 plus $1,600 in hard costs, plus roughly $6,000 in labor and schedule overruns. $14,800. Nine days late. A client who asked, very reasonably, why the lighting package was the only part of the project that kept moving.
We ate $4,200 of it. The rest came out of contingency, which meant the lobby furniture got value-engineered. The chandelier is gorgeous. The sofas are fine. Not the trade I wanted to make.
The checklist I use now
None of this was exotic. Every one of these mistakes is boring and preventable, which is exactly why I wrote it down.
- Ask what's NOT included before you ask the price. The vendor who lists every fee upfront — even when the total looks higher — usually costs less in the end. Freight, liftgate, inside delivery, debris removal, dimmer modules. Get all of it in writing.
- Demand the dimming spec sheet for every lamp. The IC T2 has its own dimmer. Anything with a built-in driver or touch control needs its own circuit, not a wall dimmer. Put it on the electrical drawings, not just the FF&E schedule.
- Put the chandelier frame on the structural drawings. Weight, canopy size, anchor type, blocking. If it isn't on the ceiling plan, it isn't approved.
- Define area light with a schedule, not a word. One line of text causes three days of rework. A fixture schedule with photometrics ends the argument before it starts.
- Buy decorative lighting from authorized dealers. A sale isn't a sale if the warranty is void. The marketplace discount on that chandelier frame was 18%. The actual cost was 100% of the frame plus freight plus five weeks.
- Rebuild the quote as total landed cost. Product, freight, accessories, dimming, installation labor, contingency for rework. The lowest quoted number was never the lowest total cost on this project.
I've learned to ask what's not included before I ask what the price is. It's a worse question to hear and a much better question to answer.
If you're specing Flos on a hospitality job this year, the fixtures will be the easy part. The outlets, the ceiling, and the invoice line that says to be confirmed are where your budget goes.