Opple brand logo

Project contact

Contact Opple with the criteria that drive selection

Include the application, mounting, lumen target, controls protocol, project location and schedule so the inquiry reaches the right review path.

Opple project support office map illustration

Project support desk

1121 Highway 74 South, Peachtree City, GA 30269, USA

Email: [email protected]

Phone: +1 770 000 0000

Hours: Monday–Friday, 08:00–17:00 ET

Social: LinkedIn / Professional Lighting Updates

Contact details on this generated site are placeholders and should be verified before publication.

Before sending a file request

Record the catalog family, optical distribution, lumen package, CCT, voltage and driver. An IES or LDT file from a nearby configuration may import normally while producing the wrong candela distribution or total output.

For an application review, add room dimensions, mounting height, surface reflectance, task plane and target illuminance. If glare, color appearance or vertical illumination is important, name that priority instead of relying on a single lumen or wattage target.

Describe the review needed

Photometric files depend on the exact luminaire configuration. Controls questions also require the protocol and sequence of operations.

Controls inquiries are most useful when they identify 0-10V or DALI-2, occupancy and daylight zones, emergency behavior, network responsibility and the intended sequence. Include the current drawing revision so responses can be tied to a stable project record.

Compliance questions should state the destination market and product configuration. UL, CE and RoHS references have different purposes and geographic contexts; none should be treated as a blanket approval for an entire project.

What happens next

The support team can route the request to photometric, application or controls review. A response may ask for missing configuration data before identifying a document. That verification step reduces the risk of a plausible but mismatched file entering the submittal package.

For schedule questions, provide the required-on-site date and whether approvals, samples or a mockup must precede release. This keeps document review separate from an unverified delivery assumption.